Daimler starts construction of second ACCUMOTIVE battery factory

,
1.81K 0

Daimler subsidiary ACCUMOTIVE starts construction of second battery factory in Kamenz, Germany. The site is expected to bring a fourfold increase of production and logistics, covering an area up to around 80,000 square feet.

With an investment of about 500 million euros, the site in Kamenz will be one of the biggest and most modern battery factories in Europe. Daimler invests an overall amount of one billion euros into the global production of battery systems.

The new production facility is planned to start operations in the middle of 2018. The area of about 20 hectares is located in immediate proximity of the existing battery factory in Kamenz, about 50 kilometers from Dresden. With the construction of the second facility, the production and logistics area will be quadrupled to about 80,000 square meters. ACCUMOTIVE will gradually increase the number of employees in the coming years. The workforce will double by the end of this decade.

The new plant will be constructed as a CO2-neutral factory. Production facilities will be powered by a cogeneration unit and a photovoltaic system combined with stationary energy storage systems. Solar modules with the surface of two football fields will be installed on the rooftop of the new production building. This equals a capacity of 2 megawatts. The new battery factory will also be benchmark for Industry 4.0 with most modern facilities and technologies.

In the future, Kamenz will produce lithium-ion batteries for all electrified vehicles of Mercedes-Benz and smart – including plug-in hybrids as well as fully electric vehicles. On top of that, Kamenz will produce batteries for stationary Mercedes-Benz energy storage units as well as 48-volt-systems. The 48-volt-system will gradually be integrated into different model ranges.